The Engineered Services Group (ESG) is skilled at evaluating existing plants and determining what is required to refurbish, modify, and move the facility to a new location.  This is true for a facility that is currently in operation or in situations where operations have been halted.   An example of a typical relocation by AMCS' ESG is featured below as a reference.  

Plant Type:

200 TPD ASU/NLU/APU

Requested Service:

Relocation, plus the addition of GOX pipeline, Cooling water system, MSA, Storage, and new control system

Relocation Activities:

Review operability and update plant control strategy to reflect additions. Review existing Lotepro, and Liquid Air P&IDs. Issue consolidated new P&IDs reflecting "as-built" instrumentation, new process equipment, and controls.

 Procurement, design, configuration, installation and commissioning of  the plant control system

Review of plant instrument and control related information, develop missing documentation such as process alarms, trips, loop diagrams, and safety interlocks. Review and verify existing plant instrumentation information.

Provide start-up services and commissioning support of facility to ensure plant supply.